Where Vision Meets Precision
Crafting innovative, high-performance small craft with expert engineering and design.
Transparent Pricing
We provide clear, upfront pricing with no hidden costs, so you know exactly what to expect from day one.
On-Time Completion
Timelines matter. We manage projects efficiently using Kaizen principles to ensure your services are delivered on schedule.
Seamless Coordination
We assist in bridging the gap between design and construction, working closely with builders to ensure your vision is executed properly.

Design & Engineering
Crafting a boat starts with a solid design, one that balances performance, safety, and aesthetics. At Sebaste Design, we specialize in innovative, functional, and efficient FRP, aluminum and polyethylene small craft designs, tailored to meet your unique requirements.
Our process ensures that every vessel is engineered for optimal hydrodynamics, structural integrity, and usability, whether for leisure or professional use. From initial concept sketches to detailed 3D models, we work closely with you to bring your vision to life with precision and expertise.
Project Management & Planning
A well-structured project is the foundation of a successful boat build. At Sebaste Design, we provide comprehensive project planning services, ensuring a smooth transition from concept to execution.
With PRINCE2 and Lean Six Sigma certifications, we apply proven project management methodologies to optimize workflows, minimize waste, and enhance efficiency. We assist in setting realistic timelines, coordinating with builders and suppliers, and managing key milestones so your project stays on track and within scope.
Our structured approach ensures precision, risk reduction, and streamlined execution, delivering a seamless outcome from initial planning to final delivery.


Regulatory & Compliance Support
Ensuring a vessel meets industry regulations is an essential part of the design and development process. At Sebaste, we provide expert guidance on marine safety, structural integrity, and environmental compliance, helping you navigate the complexities of regulatory requirements with confidence.
From stability assessments to certification support, we integrate compliance considerations into every stage of the project. Whether designing a new craft or modifying an existing vessel, we work in line with regulatory requirements to ensure your craft meets national and international standards, allowing for a seamless approval process and peace of mind.
Real-World Composite Boatbuilding Experience
At Sebaste, we go beyond the drawing board. With hands-on experience in composite boatbuilding, from workshop floor to final fit-out, we provide practical support grounded in real-world knowledge.
Whether you’re building in foam sandwich, infusion, or hand lay-up, we help bridge the gap between design intent and build reality. Our experience means we can foresee common pitfalls, offer material-specific advice, and support builders with practical, efficient solutions throughout the build process.
From advising on structural details to assisting with layup strategies, we’re here to make sure your build is not only possible, but optimal.


Our Mission
At Sebaste Design and Engineering, our mission is to deliver exceptional yacht designs that are both visionary and practical. We combine our expertise in design and production management to ensure that every project meets the highest standards of precision, functionality, and aesthetic excellence. By understanding the full spectrum of the design and build process, we provide our clients with solutions that are not only innovative but also optimized for efficient production and real-world application.